/*
* file: GanttMPXSaver.java
* author: Jon Iles
* copyright: (c) Tapster Rock Limited 2005
* date: 04/02/2005
*/
/*
* This library is free software; you can redistribute it and/or modify it
* under the terms of the GNU Lesser General Public License as published by the
* Free Software Foundation; either version 2.1 of the License, or (at your
* option) any later version.
*
* This library is distributed in the hope that it will be useful, but
* WITHOUT ANY WARRANTY; without even the implied warranty of MERCHANTABILITY
* or FITNESS FOR A PARTICULAR PURPOSE. See the GNU Lesser General Public
* License for more details.
*
* You should have received a copy of the GNU Lesser General Public License
* along with this library; if not, write to the Free Software Foundation, Inc.,
* 59 Temple Place, Suite 330, Boston, MA 02111-1307, USA.
*/
package org.ganttproject.impex.msproject;
import java.io.File;
import java.util.Locale;
import net.sourceforge.ganttproject.GanttResourcePanel;
import net.sourceforge.ganttproject.IGanttProject;
import com.tapsterrock.mpx.MPXFile;
/**
* This class allows Gantt Project data to be saved as an MPX file.
*/
public class GanttMPXSaver extends GanttMPXJSaver {
private Locale locale = null;
/**
* @see GanttMPXJSaver#GanttMPXJSaver(IGanttProject, GanttTree_old,
* GanttResourcePanel)
*/
public GanttMPXSaver(IGanttProject project, Locale locale) {
super(project);
this.locale = locale;
}
/**
* @see GanttMPXJSaver#save(File, MPXFile)
*/
public void save(File file) {
try {
MPXFile mpxFile = new MPXFile();
mpxFile.setLocale(locale);
save(file, mpxFile);
}
catch (Exception ex) {
System.out.println(ex);
}
}
}